Over the last couple months the maintenance staff has been working to dry up the area in front of #6 green over to the ladies tee on #5. The staff is in the final stages of the last of three drains that will hopefully get this area a little drier and more playable. Once the drainage and rock are in place we will come back and sod over the drains to create a more playable look. All but one of the drains were put in to help move water from old drains into the new drainage system. Thanks to our assistant superintendent, Tom Laycock, for orchestrating the design and making this project move in the right direction. Below is a picture of the last drain that is being put in at the beginning of the approach on #6.