Monday, March 12, 2012

More Drain Work In #6 Fairway

Today Tom continued with our drainage work on #6 fairway. Now that the first area we added drainage and new sod to is coming along we decided to continue with another area of the fairway. A couple of weeks ago Tom cut and removed all of the bad sod and today he started in on the drainage portion of the project. With the rain forecast for this week we may have a hard time finishing up with the drainage this week. But knowing my staff they will probably make it happen.
Below is a picture of the area after the sod was removed and then a picture of the beginning of the drainage. We will add pipe in a few of the trenches, but most of the trenches will only be filled with sand. As soon as the drain work is finished, we will prep the area and then lay sod.












Sunday, January 29, 2012

Clogged Drain In #9 Fairway

     Before we opened up the golf course we had to install a drain down the middle of #9 fairway to contol the run off from the tee area as the soil in the upper portion of this hole is pretty bad and doesn't allow that much water to penetrate the surface. The drain has worked pretty well for the better part of two years but this past summer we started to notice an area just past the fairway bunker that was a little more sturated than it had been in the past. Then, after the rain this last weekend we noticed an area in the middle of the fairway that had a lot of sand coming to the surface. So this past week we decided to get to the "root" of the problem and find out what was going on with our drain. Come to find out it really was roots that were causing the problems. The piture below is a picture of all of the roots that were pulled out of the 4" drain line. Hopefully we will get some more rain soon to test out the drain now that it is cleaned out.

Saturday, October 22, 2011

New Drain @ #1 Green

     This last week we were able to accomplish another drain down in front of #1 green. This was actually a tie-in from a catch basin along the road down to the drainage basin in the approach. When the contractors re-paved the entrance to the RV Park they installed this catch basin to help collect the water that collects and comes down the road. Tom was able to drill some hole in the side of the catch basin in the approach and slide the new drain pipe inside. This project should help to dry up a couple little areas around the parking area for the green since the water will have somewhere to go now. Thanks to my staff for doing a clean and professional looking job once again.

Catch basin in the road

New pipe installed
Finished project with sand & seed


Sunday, May 1, 2011

Is That A Mole In #9 Fairway?


     No, that's not a mole or a gopher or any varmint making a trench down #9 fairway. The "dirt" you see in the middle of #9 fairway is actually a mix of a fine mulch, sand and seed. We have begun to try to fill in the French drain that was installed before the opening of the course to help with drainage. For some reason the architect did not think that drainage was necessary in the original design. But as we observed the golf course before the grand opening, we determined that there was going to be a need for some drainage down the entire hole. The soil in #9 is some of the worst in the entire golf course and the water does not infiltrate as rapidly as the architect believed.


Wednesday, November 17, 2010

Drain in front of #6 Green

Over the last couple months the maintenance staff has been working to dry up the area in front of #6 green over to the ladies tee on #5. The staff is in the final stages of the last of three drains that will hopefully get this area a little drier and more playable. Once the drainage and rock are in place we will come back and sod over the drains to create a more playable look. All but one of the drains were put in to help move water from old drains into the new drainage system. Thanks to our assistant superintendent, Tom Laycock, for orchestrating the design and making this project move in the right direction. Below is a picture of the last drain that is being put in at the beginning of the approach on #6.