This last week we were able to accomplish another drain down in front of #1 green. This was actually a tie-in from a catch basin along the road down to the drainage basin in the approach. When the contractors re-paved the entrance to the RV Park they installed this catch basin to help collect the water that collects and comes down the road. Tom was able to drill some hole in the side of the catch basin in the approach and slide the new drain pipe inside. This project should help to dry up a couple little areas around the parking area for the green since the water will have somewhere to go now. Thanks to my staff for doing a clean and professional looking job once again.