Even though it was a short week our assistant superintendent Tom dove right in and did all of the trenching with a mini-excavator. Jake and Jose were running around too, hauling dirt, gravel and cleaning up after Tom. Here's a couple pictures of Tom and his handy work.
The original idea was to try to drain the water into a larger drain that runs across the fairway towards the lake on #18 but that didn't pan out because the elevation of that drain was too high.. So for the time being we had to make a sump type drain. In the future we may have to trench back down the fairway to one of the other drains that drain back to the lake. The sump drain is not next to the cart path because some of our irrigation pipe was in the way.