     This last week we were able to finish a couple final steps to a project we started a few months back. The project I am referring to is the new posts and cable that now runs down the entire 4th hole.



The cable and posts on #4

     What you don't see in the photo above are the irrigation wires we put and run the entire length of #4 underneath the posts and cable. We also trenched a few wires back up towards #3 green. We added these new wires for some future irrigation projects.
     The first of those projects was the addition of a sprinkler behind #4 green. Because of some improper spacing between some of the surrounds sprinkler heads we need to fill in a gap on the back left slope. Here's Hung trenching for the new pipe. As with most of our sprinkler additions this winter this should really help us keep turf healthier and much better looking than the last couple of summers.



Hung handling the trencher

     One of the final steps to the larger project was to experiment with some underground drip tubing around the fairway bunker. After seeing this done at another course in our area I have been very eager to try it out at our course. This past fall we were fortunate to purchase a new sod cutter which also came with a "mole kit" attachment that can be used to pull wires and drip tubing. Here it is with the drip tubing attached.



The "mole kit" with drip tubing

     We chose the fairway bunker on #4 for our trial run because it was fairly flat all around the bunker. First we installed a 1" electric valve and hooked it up to one of the wires we ran under the posts and cable. Next we painted a line about 14" from the edge of the bunker to run our first line. After a little trial and error we finally made it around the bunker twice (the second line about 14" from the first)and Hung got everything hooked up to the valve. Now it's time to see how long and often we need to run it throughout the summer. If it works out well we will probably try to do the same thing to a few more of our problem bunkers in the coming year.



Enrique and Hung finishing up the last stretch




Success! There's water coming out!

     We also experimented pulling some irrigation wires with the new trencher and mole kit in front of #3 green. It worked really well and helped us finally get some wires to some sprinklers we added last summer. Now we should have better control now that we can run these sprinklers from our irrigation computer.



The mole kit with wires




Our first run with wires




New sprinklers running off the irrigation clock